技改方案及節(jié)能效益分析
文章來源:未知 ?????發(fā)布者:admin
1、技改方案: Technology improving plan
將鍋爐或電廠的蒸汽通進高溫塔, 將高溫塔內(nèi)的水加熱到壓機設(shè)定的溫度, 通過循環(huán)水泵將過熱水打進壓機進行升溫。不同的過程通過電腦控制自動閥門, 將不同溫度的蒸汽、熱水和冷水按生產(chǎn)工藝的要求有序地運行。既滿足了生產(chǎn)工藝的需求, 同時也節(jié)約了能源。Input the steam in boiler or power plant into high temperature tower, heat the water in high temperature tower to setting value and pump the hot water by circulating pump into compressor for heating. The procedures would be controlled by computer. The steam, hot water and cold water would operate automatically according to different requirements which not only meets processing condition but saves energy.
2節(jié)能項目施工要求: Construction requirement on energy saving project:
項目設(shè)計制造周期為80天, 安裝周期為30天。Design and manufacture needs 80 days and installation needs 30 days.
3 項目預(yù)算回收期: Payback period of project budget
本項目預(yù)計回收期為240-300天 The payback period for this project is 240-300 days.